Skip to content

See the work. Understand the progress.

Real client examples of a hands-on growth partnership: what changed, what needs attention and what happens next. Your business deserves more than a dashboard and silence.

Book a strategy call

Personally led by Brian Bemo · Scottsdale, Arizona + nationwide

PERSONAL
Built around your business
REGULAR
Updates, answers and next steps
CONNECTED
Website + Google + AI + local
IMI DESIGN STUDIO / AI VISIBILITY

See the platforms. See the progress.

Explore IMI Design Studio’s reported AI visibility, an actual saved ChatGPT recommendation, and the context behind the numbers.

Explore the AI visibility snapshot
ChatGPTGoogle AI ModeGeminiClaudePerplexity

THE WORK. THE RESULTS. THE NEXT STEP.

Different businesses. Different priorities.

Explore real client updates: the work, dated results and the next priorities. Each example reflects that business’s goals. Your plan is built around yours.

Luxury interior design

IMI Design Studio

PROGRESS UPDATE

Aug 27–Sep 29, 2026

175 → 250U.S. Google search clicks · +42.9%

Compared with Jul 24–Aug 26, 2026: two equal 34-day periods. Average search position improved from 13.18 to 8.76.

Work, next steps + source — IMI Design Studio

THE WORK

The client update connects service content, project storytelling, technical SEO and Google Business Profile activity with changes in discovery. The website redesign remains a separate project; the report makes that distinction visible.

WHAT COMES NEXT

Continue strengthening high-intent service pages and project evidence. Review inquiry quality alongside search visibility. These search clicks do not establish consultation or revenue growth.

SOURCE + CONTEXT

Google Search Console, U.S. scope, retrieved through the connected Search Atlas account on October 30, 2026. Clicks: 175 then 250. Average position: 13.1769 then 8.7572. Percentage change calculated from those click totals. Work context: Bemo’s September 2026 client update.

Automotive retail

Unique Trucks

PROGRESS UPDATE

Sep 29–Oct 26, 2026

1,742 → 1,985Organic search users · +13.9%

Compared with Sep 1–28, 2026: two equal 28-day periods. Organic search sessions increased from 3,898 to 3,962.

Work, next steps + source — Unique Trucks

THE WORK

The October update records ten truck landing pages, improved make/model navigation, FAQ and internal-link work, and 18 irrelevant search terms excluded from Google Ads. Website, content and advertising work are discussed together, with their measurements kept separate.

WHAT COMES NEXT

Keep improving useful truck content, inventory discovery and inquiry paths. Validate conversion tracking before treating recorded calls as qualified leads or sales. The two prepared ad groups were still paused in the dated update.

SOURCE + CONTEXT

Google Analytics 4, UniqueTrucks.com property, Organic Search segment; retrieved through the connected Search Atlas account on October 30, 2026. Current users: 1,985; change: +243; prior users: 1,742. Percentage change calculated from those totals. Work context: Bemo’s October 27, 2026 update. Visitor growth is not verified sales growth.

Healthcare · Phoenix + Scottsdale

Internal Medicine AZ

PROGRESS UPDATE

Aug 27–Sep 29, 2026

Two officesSeparate local priorities

The report distinguishes stronger Phoenix visibility from Scottsdale opportunities, rather than treating both offices as one market.

Work, next steps + source — Internal Medicine AZ

THE WORK

The update connects a modernized website with service and location content, local search, Business Profile activity and sampled AI visibility. It shows why each office needs its own priorities and patient contact paths.

WHAT COMES NEXT

Continue improving Scottsdale discovery while supporting Phoenix. Review location-specific searches and patient journeys. Appointments require separate booking or inquiry evidence.

SOURCE + CONTEXT

Bemo’s supplied Internal Medicine AZ Visibility Report, Aug 27–Sep 29, 2026, and the existing Bemo project case study. This example illustrates customized scope; no unverified AI-score increase or appointment result is claimed.

Professional services · Phoenix

Affordable Mediation

PROGRESS UPDATE

Aug 7–Sep 29, 2026

Work + prioritiesSearch, local and campaign updates

A tailored update brings organic visibility, a newly launched ads campaign, the landing page and local presence into one conversation.

Work, next steps + source — Affordable Mediation

THE WORK

The report records campaign setup, landing-page and consultation-form work, ongoing SEO/content improvements, Google Business Profile posts and local citations. Paid clicks are shown separately from organic search.

WHAT COMES NEXT

Refine the campaign, strengthen conversion measurement and keep service content useful. The next decisions should reflect both the numbers and the inquiries the business actually receives.

SOURCE + CONTEXT

Bemo’s supplied September 2026 Affordable Mediation progress report. This text summary describes work and next priorities; the separate graphic is an illustrative example with unverified figures.

Local home services · East Valley

GT Garage Door Repair

PROGRESS UPDATE

Progress through September 2026

Local coverageDifferent services. Different gaps.

The report separates garage-door repair from installation coverage across Chandler and nearby communities.

Work, next steps + source — GT Garage Door Repair

THE WORK

The update describes service content, Business Profile activity, local citations, technical improvements and review support. Local map grids help identify where visibility is stronger and where more work is needed.

WHAT COMES NEXT

Prioritize weaker service-area coverage, improve mobile contact paths and review the calls the business receives. A map ranking is a location-specific observation, not a promise of the same position everywhere.

SOURCE + CONTEXT

Bemo’s supplied GT Garage Door Repair progress report through September 2026. This text summary describes the reporting approach; the separate graphic is an illustrative example with unverified figures.

Landscape architecture

Waibel & Associates

PROGRESS UPDATE

Six-month progress overview

Longer-term viewContent, authority and visibility

The update puts ongoing publishing, website improvements and local presence into a broader view of the firm’s discovery.

Work, next steps + source — Waibel & Associates

THE WORK

The report describes recurring SEO content, Business Profile posts, citation work and technical optimization. It links that activity to the firm’s services and expertise rather than presenting an identical checklist for every client.

WHAT COMES NEXT

Keep building useful project and service content, review relevant discovery trends and refine the next priorities. Reporting dates and metric definitions must be clear before making numerical comparisons.

SOURCE + CONTEXT

Bemo’s supplied Waibel & Associates SEO + AI Visibility Progress Snapshot. The source does not establish exact dated comparison windows. Its graphic is shown separately as an illustrative example, not verified numerical evidence.

PROGRESS WITH CONTEXT

A useful report ends with a decision.

A gain can show where to build momentum. A flat or declining metric can reveal a page, campaign or customer journey that needs attention. We connect the available evidence with completed work, your feedback and the next priorities. Search visibility, website visitors, calls, qualified inquiries and revenue are different measures.

Your priorities stay part of the conversation.

New services, seasonal needs, a location launch, a confusing website page or an urgent question can change the plan. You work directly with Brian to agree what matters next. Regular reporting keeps that direction visible; it does not promise every number will rise each month.

Questions + answers

Are these real client examples?

Yes. The work summaries are based on Bemo’s supplied client updates. The numeric highlights identify their reporting dates, comparisons and connected data sources. They are selected examples, not a forecast or guarantee for another business.

Will my reports look exactly like these?

Your reports are tailored to your services, locations, goals and agreed scope. We use clear visual summaries where useful, explain the important changes and set out the next priorities. The format can evolve as your needs change.

Can I ask questions between reports?

Yes. You can contact Brian with questions, changing business priorities or issues that need attention. We address them within your agreed working arrangement and explain when extra work needs its own scope.

Does a visibility increase mean more sales?

Not by itself. Search impressions, rankings, sampled AI mentions and website visits show discovery or activity. Qualified inquiries, appointments and sales need separate evidence and tracking. We explain those distinctions.

Let’s talk
BEMO DESIGN

A CONVERSATION STARTS HERE

Let’s talk growth.

One clear next step for your business.